Access control can usually be retrofitted in existing buildings step by step and during normal operation. The effort depends on the number and type of doors, the cabling and the kind of administration you want.
Which technology is suitable for retrofitting?
There are two routes for retrofitting, and they can be combined. Wired readers control doors with electric locking and report every access to the software immediately. Battery-powered electronic door fittings and cylinders need no cable at the door.
In practice, external doors and sensitive areas are often wired. Internal doors are given electronic fittings. This keeps the intervention in the building small.
What does the effort depend on?
The effort depends above all on the doors and on the cable routes. The following are checked:
- Number and construction of the doors. For fire doors and doors on escape routes, the approvals must be observed
- Condition of doors, locks and drives
- Cable routes, network and power supply
- Scope of the software: sites, number of users, time profiles
- Interfaces to time recording, the intruder alarm system, barriers or video
- Credentials: current encrypted transponder technologies such as MIFARE DESFire and the question of whether existing cards can still be used
How does the retrofit proceed?
The retrofit starts with a site survey and a door list. All further steps build on this:
- Site survey: every door is recorded with its construction, use and cabling
- Authorisation concept: who may go where, and when?
- Quotation based on the door list and concept
- Installation in sections, set-up of the software
- Issue of the credentials and training of the administrators
- Handover with documentation
How is operation kept secure during the conversion?
Operation stays secure because the conversion takes place in sections. Every door remains usable with the previous key until it is switched over. A cut-over date is agreed for each area, from which the credentials apply.
Work on heavily used doors can be scheduled outside peak hours by arrangement. Escape and rescue routes remain usable throughout the construction period. Employees receive their credentials before the cut-over date.
What needs doing after commissioning?
After commissioning, the system has to be administered and maintained. Lost credentials are blocked. Rights are adjusted when people join, change roles or leave. Batteries in fittings and cylinders are replaced in good time. Software and devices receive updates.
Access logs are personal data. Define the purpose, access and retention period, and involve the data protection officer and, where one exists, the works council. This article gives an overview and is no substitute for legal advice. RUTTE is a certified OEM partner of SALTO and AUTEC and plans the retrofit after a site survey.